Following on from the successful completion of the first energy-from-waste plant in Ferrybridge, UK, the Swiss clean-tech company Hitachi Zosen Inova has received the order to construct the second facility. The company’s ninth project in the UK will mark a new milestone. The complete plant, consisting of a total of four lines, ranks among Europe’s largest and most efficient energy-from-waste plants.

Braavos was doing the layout of the connection between generator and generator circuit-breaker. The connection carries incredible 5000 A at 11 kV

  • Dimensioning of cables between generator and generator circuit-breaker
  • Thermal rating calculations according to IEC 60287 using the software Cableizer
  • Optimization of ductbank layout, arrangement of ducts, estimation of losses
  • Calculation of the magnetic fields
  • AutoCAD drawings of the ductbank
  • Dimensioning and layout of busbar in channel in comparison
  • Specification of air ventilation for cooling of channel with busbars